Sunbury Community Arts and Cultural Precinct

  • Project statusPlanning
  • Project value8.276 Million
B22-Annexe-Exterior-2.jpg

With support from the State Government, we are creating an arts and cultural precinct on Jacksons Hill in Sunbury.    

We're transforming Building 22 (the former Female Refractory) and Building 24 (a work shed) on Jacksons Hill into a destination for art, community and cultural connection. 

  • A welcoming place for a connected, creative community
  • A place of meaning and connection
  • A place that is successful and sustainable
  • A place that involves and empowers community

In order to bring our vision to life, refurbishment works are planned from April 2025 until October 2025.

Completed and future works

Works completed

  • Gathered community ideas for the site
  • Architect worked with community to create a concept plan for the site
  • Sought community feedback on the concept plan
  • Finalised the concept plan
  • Sought expressions of interest for Community Advisory Board members
  • Architect created detailed designs to inform construction and heritage permit
  • Sought a heritage permit from Heritage Victoria for the refurbishments
  • Appointed a builder for refurbishment
  • Appointed Community Advisory Board

Works to come

  • Construction / refurbishment begins – May 2025  
  • Finalise facility name – mid 2025  
  • Reopening – late 2025   

Project news, events and background

Subscribe

* indicates required

Frequently asked questions

What is already happening at the precinct?

There is a thriving sense of community from a range of arts, theatre, heritage and community groups and 3NRG radio station. Art is created, community is entertained and informed and local history is nurtured and archived. The Sunbury Primary School, Sunbury and Macedon Ranges Specialist School and Sunbury Woodturners Group are nearby and also contribute to the sense of community.

What activities could take place?

The range of activities that could happen in the buildings in the precinct are:

Arts / Gallery

  • renovated existing arts spaces
  • including sculpture, pottery, painting
  • new arts spaces (e.g. digital arts)
  • presentation spaces
  • exhibitions

Business / Tourism

  • small business incubators
  • café and/or restaurant
  • cultural centre
  • micro-brewery/winery
  • small retail outlet showcasing
  • locally produced works
  • information hub

Events

  • music festival
  • cultural festivals of food, arts, music,
  • farmers markets
  • indoor/outdoor community events
  • promotion of health through programming

Theatre/Performing Arts

  • rehearsal/development space
  • performance space
  • space for dance classes

Community

  • meeting spaces
  • informal training spaces
  • multi-purpose spaces/flexible over time
  • civic function
  • consultants spaces (visiting services)
  • location for radio station
  • location for heritage and historical records and displays
  • location for wood work
  • youth activities including music production

Public Realm

  • community garden
  • cycling and walking destination

What is the approach for redevelopment?

The recommended approach to developing the site involves restoration works and enhancements to existing buildings, increasing their versatility and ease of use for a wide array of groups and individuals. These recommendations are based on a demand assessment, feasibility assessment, and are based on a mix of community, commercial, and tourism uses.

Firstly, there are maintenance and access issues that would need to be addressed. Over time expansion of buildings and changes are proposed to allow for increased dance and performing arts, incubator spaces for small business start-ups and artist uses, and food and beverage offerings to support the proposed tourism and commercial component of the precinct.

Why is this project taking a long time?

This site was previously owned by Victoria University (VU).  The State Government, who purchased the Jacksons Hill site in 2018 from Victoria University (VU), developed a master plan to guide the re-purposing of the former university campus.

The master plan involves the redevelopment and use of four buildings below, and divides the area up into different precincts for a range of uses including residential development, commercial activity, education and training as well as arts and culture:

  • Building 18 Bluestone Building
  • Building 19 Radio Station
  • Building 20 Boilerhouse Arts Centre
  • Building 21 Shed

Complex planning processes involving heritage and conservation have created delays in the State Government transferring the four buildings to Council (this transfer has not taken place yet).

However, in October 2022, a new opportunity came along, where Council was able to secure a long-term lease with the State Government for a near-by parcel of land which houses two buildings including the heritage-listed former Female Refractory Ward (or Building 22).

This opportunity has enabled Council to re-ignite the project and start to plan and develop Stage 1 of the Sunbury Community, Arts and Cultural Precinct on Jacksons Hill.

How is this Project being funded?

The estimated cost to develop this long term vision is $8.5 million.

Council will need to work with Government and other partners to attract funding for the redevelopment. Council wants to build on the energy and guidance of the Community Advisory Group (CAG) and find interim means to support and enhance the precinct in its current form.

Who is completing the refurbishment works?

The builder is Stokes Rousseau, and they have extensive experience in heritage restoration and are listed on the Victorian Heritage Services Directory. 

 

Are you demolishing the historic buildings?

No. The restoration has been carefully designed to be sensitive to the historical and cultural significance of the site. Heritage Victoria has issued a heritage permit for the refurbishments to Building 22, the former Female Refractory. 

 

How will I be impacted by the refurbishment works?

During the works, there will be increased vehicle movements in Circular Drive and Boilerhouse Drive and some of the informal parking areas in Boilerhouse Drive will no longer be accessible. 

There will also be some construction noise during the refurbishment works. 

Most of the works will be completed on weekdays, between the hours of 7am and 4pm. 

Where possible, we will avoid additional traffic movements during school drop-offs and pick-up times

 

What's happening to the rest of Jacksons Hill?

The Jacksons Hill site was previously owned by Victoria University. The State Government purchased the land and developed a master plan to guide the re-purposing of the former Uni campus. 

In 2022, Council signed a long-term lease for a parcel of land which houses two buildings – Building 22 the former Female Refractory Ward and building 24 a former work shed. This is the area we are refurbishing. 

The rest of Jacksons Hill is still part of a complex planning and heritage process.

 

Contact details

Carina Doolan
Senior Project Manager

Location

17 Circular Dr, Sunbury 3429  View Map

Google Map