The primary purpose of the project is to reconstruct a section of Wildwood Road which was damaged by the floods in 2022. These works will allow the road to function safety and effectively.
From Monday 18 November, we are going to reconstruct both approaches of the bridge located at Deep Creek , Wildwood Road, Bulla.
As part of the reconstruction, we will:
- Profile the existing spray sealing
- Do Cut and fill earthworks
- Lay wearing course along approximately 350m of road length
- Install roadside barriers
- Regrade roadside catch drains
- Do Line marking and signage improvements
To do the work in a safe and efficient way, Wildwood road will be closed for four weeks (day and night) from 18th of November with access to local traffic only. Wildwood road will be closed at Gellies road at Northside and Somerton road at south side with access to local resident only. Traffic crew will be patrolled at both locations during day time on working days and after care arrangement will be in place on other duration. Please refer to traffic controllers and detour signs on site while these works take place.
These works are aim to finish in four weeks, with the progress dependent on weather conditions. We encourage you to plan your journey and allow additional travel time.
Thank you for your patience while we complete these important works.